Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kojima, Atsushi; Hanada, Masaya; Yoshida, Masafumi; Umeda, Naotaka; Hiratsuka, Junichi; Kashiwagi, Mieko; Tobari, Hiroyuki; Watanabe, Kazuhiro; Grisham, L. R.*; NB Heating Technology Group
AIP Conference Proceedings 1655, p.060002_1 - 060002_10, 2015/04
Times Cited Count:6 Percentile:87.25(Physics, Applied)In this paper, the recent activities on the new test stand are reported toward demonstration of the long pulse production for 22A, 100s negative ion beams. As for the temperature control of the plasma grid, a prototype of the grid with cooling/heating by circulating a high-temperature fluorinated fluid has been improved to cover the full extraction area by using 5 segments of the PG. These grids were found to have a capability to control the temperature with a time constant of 10s as well as the prototype grid. As a result, 15A negative ion beams for 100s have been achieved.
Umeda, Naotaka; Kojima, Atsushi; Kashiwagi, Mieko; Tobari, Hiroyuki; Hiratsuka, Junichi; Watanabe, Kazuhiro; Dairaku, Masayuki; Yamanaka, Haruhiko; Hanada, Masaya
AIP Conference Proceedings 1655, p.050001_1 - 050001_10, 2015/04
For ITER neutral beam system, negative deuterium ion beam of 1 MeV, 40 A (current density of 200 A/m) is required for 3600 s. To demonstrate ITER relevant negative ion beam acceleration, beam acceleration test has been carried out at MeV test facility in JAEA. The present target is H ion beam acceleration up to 1 MeV with 200 A/m for 60 s, which beam energy and pulse length are the present facility limit. To extend pulse duration time up to facility limit at high power density beam, new extraction grid has been developed with high cooling capability, which electron suppression magnet is placed under cooling channel. In addition, the aperture size of the electron suppression grid is enlarged from 14 mm to 16 mm and the aperture displacement is modified to reduce collision of negative ion beam on the grid. By these modifications, total grid power loading has reduced from 14% to 11%. As a result, beam acceleration up to 60 s which is the facility limit, has achieved at 700 kV, 100 A/m of negative ion beam without breakdown.